Topic 255 · Answers
Kavach 4.0 on Vadodara–Nagda Section
Which railway commissioned Kavach 4.0 on the Vadodara-Nagda section on 30 March 2026?
- Central Railway
- Northern Railway
- Correct answer: Western Railway
- West Central Railway
Core Trigger: Western Railway commissioned Kavach 4.0 on the Vadodara–Nagda section, 224.51 route km, on 30 March 2026.From Book 1 RATNA, topic 255, point 1
Kavach 4.0 covered Vadodara-Mangal Mahudi and which other stretch of the section?
- Mangal Mahudi-Panchpipliya
- Godhra-Dahod
- Nagda-Ratlam
- Correct answer: Panchpipliya-Nagda
Theme: Covered stretches are Vadodara–Mangal Mahudi (122.5 km) and Panchpipliya–Nagda (102.01 km); the middle gap remained.From Book 1 RATNA, topic 255, point 2
Who was Union Railways Minister as of March 2026?
- Nitin Gadkari
- Piyush Goyal
- Correct answer: Ashwini Vaishnaw
- Jyotiraditya Scindia
Current Head: Ashwini Vaishnaw was Union Railways Minister as of March 2026.From Book 1 RATNA, topic 255, point 3
Kavach is indigenous Automatic Train Protection built to which Safety Integrity Level?
- SIL-1
- SIL-2
- SIL-3
- Correct answer: SIL-4
Key Term: Kavach is indigenous Automatic Train Protection built to SIL-4, the highest Safety Integrity Level.From Book 1 RATNA, topic 255, point 4
Which is/are correct? (1) Kavach covers 559.5 of 693 route km on the Mumbai-Delhi line. (2) A record 472.3 km was commissioned on 30 March 2026.
- Correct answer: Only 1
- Only 2
- Both 1 and 2
- Neither 1 nor 2
Data: Kavach covers 559.5 of 693 route km on Western Railway's Mumbai–Delhi line; a record 472.3 km was commissioned on 30 January 2026.From Book 1 RATNA, topic 255, point 5
Commissioned Kavach length rose from 738 route km in December 2025 to how many by March 2026?
- 1,100 route km
- 1,830 route km
- Correct answer: 1,452 route km
- 2,633 route km
India Link: Commissioned length rose from 738 route km (December 2025) to 1,452 (March 2026), and about 2,633 by 31 July 2026.From Book 1 RATNA, topic 255, point 7
RDSO, which approved the Kavach 4.0 specification, is located in which city?
- Kanpur
- Varanasi
- Nagpur
- Correct answer: Lucknow
Headquarters: RDSO, which approved the Kavach 4.0 specification on 16 July 2024, is in Lucknow.From Book 1 RATNA, topic 255, point 8
RDSO was set up as an attached office of the Railway Board in which year?
- 1947
- Correct answer: 1957
- 1950
- 1966
Founded: RDSO was set up in 1957 as an attached office of the Railway Board.From Book 1 RATNA, topic 255, point 9
Kavach was adopted as the National ATP system in which month and year?
- February 2016
- July 2024
- Correct answer: July 2020
- March 2026
Landmark: Field trials began in February 2016; Kavach was adopted as the National ATP system in July 2020.From Book 1 RATNA, topic 255, point 10
Which is/are correct? (1) Railways is Entry 22 of the State List. (2) The Railways Act, 1989 governs railway operations.
- Only 1
- Correct answer: Only 2
- Both 1 and 2
- Neither 1 nor 2
Statute: Railways is Entry 22 of the Union List; the Railways Act, 1989 governs operations.From Book 1 RATNA, topic 255, point 11
Open these answers in the app (sign-in needed)
SamudraManthan