CURRENT AFFAIRS | 14 OCTOBER 2026
The PM GatiShakti National Master Plan (NMP) for Multi-modal Connectivity completed five years on Tuesday, 13 October 2026. The plan was launched on 13 October 2021 as a GIS-based digital platform that brings the infrastructure planning of different ministries and States onto a single map — so that a new highway, rail line, port, airport, waterway, gas pipeline or power line is planned with full knowledge of every other asset around it.
The five-year milestone is a good moment to understand what GatiShakti actually is. It is not a funding scheme and does not build anything itself. It is a planning framework and a shared data platform built on the idea of a “Whole of Government” approach. According to the Ministry of Commerce & Industry, the Department for Promotion of Industry and Internal Trade (DPIIT) anchors the initiative through its Logistics Division.
What the plan does
Before GatiShakti, infrastructure in India was often planned in silos. A road might be laid, then dug up for a water pipeline, then again for an optical fibre cable; a new railway siding might be built with no road link to the factory it was meant to serve. GatiShakti tries to end this by putting all relevant data layers — existing roads, rail lines, forests, rivers, utilities, land records, economic zones — onto one geospatial (GIS) platform that every ministry and State can use.
According to a PIB release of 11 August 2026 (a written reply in the Lok Sabha by the Ministry of Commerce & Industry), the NMP uses geospatial data, satellite imagery and API integration to help ministries and States plan, monitor and optimise infrastructure, including social infrastructure such as schools and health centres. The release states that GatiShakti “provides an integrated planning framework”, while approval and implementation remain with the respective ministries and States under their own schemes and budgets. For that reason, the Government says, no separate budget, quantified targets or expenditure requirements have been set under GatiShakti.
How it grew: the numbers on record
PIB has published progress figures at different points. They should always be read with their dates:
- October 2024 (three-year mark): a PIB release of 12 October 2024 stated that more than 44 Central Ministries and all 36 States/UTs had been onboarded, with over 1,600 data layers integrated, and that over 200 big-ticket projects had been evaluated by the Network Planning Group. All 36 States/UTs had developed their own PM GatiShakti State Master Plan (SMP) portals.
- August 2026 (latest on record): the PIB release of 11 August 2026 stated that 58 Central Ministries/Departments and all 36 States/UTs are onboarded; about 1,800 data layers are integrated; and 396 infrastructure projects worth about ₹18.66 lakh crore have been evaluated through the Network Planning Group mechanism, of which 256 have been sanctioned and 198 are under implementation.
- The same 2026 release notes that a public platform was launched in September 2025, giving private entities and the general public query-based access to GatiShakti data analytics.
Background & Framework
Seven engines. A PIB background note (October 2022) describes the GatiShakti approach as driven by seven engines: Roads, Railways, Airports, Ports, Mass Transport, Waterways and Logistics Infrastructure. These are supported by energy transmission, IT communication, bulk water and sewerage, and social infrastructure.
Three-tier institutional framework (per the same PIB note):
- Empowered Group of Secretaries (EGoS) — headed by the Cabinet Secretary, with Secretaries of 18 central ministries as members and the Head of the Logistics Division as Member Convenor; it reviews and monitors implementation.
- Network Planning Group (NPG) — evaluates major infrastructure projects at the planning stage for multimodality, last-mile connectivity and synchronised execution.
- Technical Support Unit (TSU) — provides technical expertise.
Technology partner. BISAG-N (Bhaskaracharya National Institute for Space Applications and Geo-informatics) provides technical support — PIB (2024) notes it is supporting the District Master Plan portal and training officials.
Companion policy. The National Logistics Policy (NLP), approved by the Union Cabinet on 21 September 2022, complements GatiShakti: GatiShakti handles integrated infrastructure planning, while NLP addresses the efficiency of logistics services, processes, regulation and skills.
Analysis: why five years matters
Cooperative federalism in practice. Infrastructure in India is split across the Union, State and Concurrent Lists of the Seventh Schedule. Railways and national highways are Union subjects, while many roads, land, water and local works are State matters. A plan that works only at the Centre would be incomplete. That all 36 States/UTs are onboarded with their own State Master Plans is what makes GatiShakti a national, not merely central, platform. PIB’s 2024 release explicitly linked its regional workshops to the “spirit of cooperative federalism”.
Logistics cost. High logistics costs reduce the competitiveness of Indian goods. The August 2026 PIB release cites a DPIIT–NCAER assessment (2025) estimating India’s logistics cost at 7.9% of GDP. The 2024 release cited India’s improvement to 38th in the World Bank’s Logistics Performance Index 2023, up from 44th in 2018.
Data-driven governance. GatiShakti is an example of digital public infrastructure applied to planning. The opening of a public platform in 2025 extends its use beyond government to private investors — but also raises questions about which data is shared and how securely, which the Government has said will be limited to non-sensitive data.
The limit of a planning tool. Because GatiShakti carries no separate budget, its success depends on whether ministries and States actually use it to change project design. A platform can show where a rail line and a highway should meet; it cannot by itself acquire land, clear forests or finance construction.
The CLAT Angle
GK: Expect questions on the launch date (13 October 2021), the seven engines, the nodal department (DPIIT, Ministry of Commerce & Industry), the three-tier structure (EGoS–NPG–TSU), the technology partner BISAG-N, and the companion National Logistics Policy (2022).
Legal / Polity: GatiShakti is an executive initiative, not a statute. It connects to the Seventh Schedule distribution of subjects and to cooperative federalism. Infrastructure projects it plans may still need clearances under laws such as the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and forest and environment laws — a planning platform does not replace legal approvals.
Reading comprehension: Passages on “silo planning vs integrated planning” are common; know the logic of last-mile connectivity and multimodality.
Key Facts
- Full name: PM GatiShakti National Master Plan for Multi-modal Connectivity.
- Launched: 13 October 2021; completed five years on 13 October 2026.
- Nature: GIS-based digital planning platform; a “Whole of Government” approach.
- Nodal: DPIIT (Logistics Division), Ministry of Commerce & Industry.
- Seven engines: Roads, Railways, Airports, Ports, Mass Transport, Waterways, Logistics Infrastructure.
- Institutions: EGoS (headed by Cabinet Secretary), Network Planning Group, Technical Support Unit.
- Tech partner: BISAG-N (Bhaskaracharya National Institute for Space Applications and Geo-informatics).
- October 2024 (PIB): 44+ Central Ministries and 36 States/UTs onboarded; 1,600+ data layers.
- August 2026 (PIB): 58 Ministries/Departments and 36 States/UTs; about 1,800 data layers.
- NPG evaluations (Aug 2026): 396 projects, about ₹18.66 lakh crore; 256 sanctioned, 198 under implementation.
- Budget: no separate fund; projects are financed by the ministries and States concerned.
- Companion: National Logistics Policy, approved by the Union Cabinet on 21 September 2022.
Memory Hook / Mnemonic
Seven engines: “RRAP MWL” — “Roads, Rails, Airports, Ports — Mass transport, Waterways, Logistics.”
Structure: “E-N-T” — Empowered (Secretaries), Network (Planning), Technical (Support).”
Dates: “13-10-21 born, 13-10-26 turns five.” GatiShakti = the map; National Logistics Policy = the movement.
Practice Quiz — 10 CLAT-Style Questions
Click an option to reveal the answer and explanation.